Thursday, May 31, 2018

Magnificent Seven update

Well friends here is the next installment of my Magnificent Seven project.
Today I am adding two buildings and a gateway in and out of an alley.

As always please feel free to comment.

This is a shot of the back of the building to the left of the arched building.

 Inside of the same building.
 Front of the above building.
 Front and right side of the above building with the roof on.

 Above and below are the two new buildings without their roofs. Also the alley at the end of their block.

 Below is the north side of the village. It is missing just one more building at the far left.
 After the last building for the north side of the village there will be three left to build plus storage structures and walls.
Take care and thanks for looking.
Greg

Saturday, May 12, 2018

Magnificent Seven building #3

Have finally completed the third building for the Magnificent Seven game I am putting together. Hoping to have it all complete and ready to run for Little Wars 2019 and Adepticon 2019.
This building took longer than expected and I am not quite pleased with it. The tiled roof is too tall and I might decide to rework it later if I have time. There are 6 more buildings to complete plus  number of walls, fences, storage structures and the cemetery. So here is #3.





Please let me know what you think.
Good gaming - Greg